Well it is about time for an update. To be honest, the new tank is allready running since last friday, but i am still working on the canopy. Here are some pics since the last update:
Drilling glass didn't work out the way i expected it to be:
Lot's of piping:
The tank is on the stand for the first time:
You can allready see some of my plumbing lying at the bottom:
First light fixture installed, just to see the background:
Installing pump security. This way, the pump can't run dry. Someone from the netherlands made this for me. Basicly it is a relais attached to a floater which is located in the last section of my sump. If the water level drops, a contact is made and the power is cut from the 2 sockets you see there.
Quick-view of the current plumbing, attached to the tank:
Voila:
Had to make an adjustment to the CO2 reactor (p.s. tank didn't stop running. Due to the excessive ammount of plumbing, i was able to remove the reactor without spoiling water):
You have done some incredible plumbing work on the sump and returns, I only have two questions:
1) Is it a wet/dry sump or is it just wet
2) do you have a top to your sump to seal in c02?
3) does your tank have any type of lid to reduce c02 loss?
guess it was 3 questions =P